ZorixGrid – Plant control, EMS and grid code compliance | itZorix

Control, compliance and intelligence for solar, storage and hybrid plants

ZorixGrid is a power plant controller and energy management system for grid-connected battery storage, hybrid PV plants and PV plants: one controller that takes the grid operator's instructions, controls every PCS and inverter at the point of connection, keeps the battery ready within its warranty limits, and records the evidence for availability and grid code compliance.

10 ms

real-time control cycle

≤ 50 ms

first response at the point of connection

16 PCS

per controller, more via block controllers

≥ 4 h

control and logging on UPS

Design value with suitable PCS; confirmed at site acceptance testing.

The stack

Six layers, from the field to the cloud

Each layer has a clear job and timing. Fast control stays at site on deterministic hardware; planning, compliance and analytics sit above it. One shared control core keeps the field controller and its simulation models identical.

Across every layerSecurity by design (IEC 62443) · Common data model · Approved, versioned settings · Full audit trail · Grid operator profiles
06

Cloud and intelligence

Fleet view and analytics

ZorixGrid Cloud

Fleet monitoring, alarms, KPIs and reports. Read only: the cloud monitors, it never dispatches.

ZorixGrid TwinRoadmap

Battery and plant digital twin for degradation and what-if analysis

itZorix KIP

Knowledge Intelligence Platform for O&M knowledge, documents and audit

05

Compliance and studies

Grid code evidence and models

ZorixGrid Comply

Grid code compliance monitoring at the connection point, power quality, event records and test reports

ZorixGrid Models Studio

Study files, study runs and the signed operating envelope for each plant in PSS®E and PSCAD™, with a check that the PCS settings on site match the models.

04

Site supervisory

Seconds to hours

ZorixGrid EMS, Gateway and local HMI: planning, grid operator link and operator screens.

ZorixGrid EMS

Scheduling, state-of-charge management, PV and storage coordination, site forecasting

ZorixGrid Gateway

Secure link to the grid operator and utility SCADA over IEC 60870-5-104 or a secure REST API, with a command log and settings management.

ZorixGrid HMI

Local operation from a live single-line diagram, with drill-down to every PCS and battery

03

Real-time control

Millisecond cycle, deterministic

ZorixGrid PPC

Power plant controller: active and reactive power, voltage, power factor, frequency response, ramps and fail-safe states

ZorixGrid Corecontrol library

One control code base, compiled for the field controller and for every simulation model

02

Site controller hardware

Sized to the plant

SC-100 Edge, SC-200 Plant and SC-200H Plant redundant, on industrial, deterministic hardware.

SC-100 Edge

Industrial edge computer with a real-time control core, fast metering and secure communications

SC-200 Plant

Real-time controller and supervisory computer with grid measurement, Class A power quality analyser and the study envelope

SC-200H Plant redundant (option)

Two SC-200 controller sets in hot standby with automatic failover, for plant sites that require redundancy

01

Field and grid

Your equipment, any vendor

Battery storage, solar PV, measurement and protection, any PCS and inverter vendor.

Battery storage

PCS, BMS, auxiliaries

Solar PV

Inverters, loggers, weather stations

Measurement

Meters, CT/VT, protection relays

Utility

System operator, SCADA, metering

Engineering toolsZorixGrid Site builder (plant topology, devices, network plan and the signed site file) and ZorixGrid Commissioning (step-by-step signed commissioning, from factory test to grid connection).
Tap a block to see its data flows
Interactive model

The control architecture

A live model of how ZorixGrid runs a plant. Commands from the system operator enter through the Gateway, the EMS plans what the plant should do, and the PPC makes the point of connection follow within milliseconds.

The compliance engine records every event and checks it against the grid code. The cloud receives data for monitoring and reports only.

Use the controls beneath the diagram to simulate system state, switch assets online or offline, and compare the Edge and Plant configurations. Select any block in the diagram to inspect its data flows.

  • PowerTurn the simulated ZorixGrid system on or off.
  • BatteryTake the battery storage asset online or offline.
  • Solar PVTake the solar PV asset online or offline.
  • EdgeShow the standard edge control configuration.
  • PlantAdd the plant-level power quality analyser to the model.
  • Tap a blockHighlight that block and view its active data flows below the diagram.
Applications

Built for three kinds of plant

One control core, configured for how the plant earns and how the grid operator dispatches it.

Solar plus storage

Charge from PV, discharge in the evening peak.

ZorixGrid plans daytime charging from solar, keeps grid import at zero where rules require it, declares availability to the operator and follows dispatch at night within grid code response times.

Standalone storage

Grid-charged storage paid for capacity and availability.

ZorixGrid follows operator set-points and AGC, keeps the battery ready at the agreed state of charge, recharges after dispatch, and records availability, capacity tests, round-trip efficiency and battery health to the contract's rules.

Solar plant control

Grid code control for PV plants.

Active and reactive power control at the point of connection, curtailment and export limits, and compliance evidence.

Operator screens

See it in operation

ZorixGrid operator overview screen on a control room monitor
Operator screens: the plant at a glance, from the point of connection to every PCS.
ZorixGrid Cloud fleet view on a monitor
ZorixGrid Cloud: every site in one read-only fleet view.

Screens shown with example data. Full operator screens are shown in a live demonstration.

Products

What each product does

01

ZorixGrid PPC

Real-time plant control at the point of connection: active and reactive power, voltage, frequency response, ramps and fail-safe states, coordinating every inverter and battery as one plant.

02

ZorixGrid Core

One control code base for the field controller and every simulation model, so what you study is what you run.

03

ZorixGrid EMS

Plans and runs solar-plus-storage and standalone storage from a site PV forecast: charging plan, state of charge and availability declaration, within battery and contract limits.

04

ZorixGrid Gateway

Secure, auditable link to the grid operator over IEC 60870-5-104 or a secure REST API; further protocols as adapters.

05

ZorixGrid HMI

Local operator screens: live single-line diagram, EMS plan, alarms, grid services and settings by role.

06

ZorixGrid Comply

Continuous grid code compliance evidence, plus availability and capacity test records.

07

ZorixGrid Models Studio

Studies in PSS®E and PSCAD™, the signed operating envelope for each plant, and a check that PCS settings on site match the models.

08

ZorixGrid Site builder and Commissioning

The signed site file (topology, devices, network plan), then step-by-step signed commissioning from factory test to grid connection.

09

ZorixGrid Cloud

One read-only view of every site: status, reports and alarms. The cloud monitors; it never dispatches.

10

ZorixGrid TwinRoadmap

Digital twin for battery degradation, augmentation planning and testing decisions.

Deployment

Three site configurations, one software stack

SC-100 · EDGE

Plants below 5 MW

  • Beckhoff CX5340 real-time controller with integrated supervisory functions
  • Fast metering at the connection point
  • Router with segregation; FortiGate or similar optional
  • Wall-mounted IP54 cabinet
  • Full EMS, Gateway, HMI and Cloud functions
SC-200 · PLANT

5 MW and above, standalone storage

  • Real-time controller plus Beckhoff C6030 supervisory computer
  • IEC 61000-4-30 Class A power quality analyser
  • Study envelope and model checks
  • FortiGate or similar firewall
  • Floor-standing IP54 cabinet
SC-200H · PLANT REDUNDANT

Option for plant sites requiring redundancy

  • Two SC-200 controller sets in hot standby
  • Automatic failover
  • Redundant firewall

Grid operator: Secure REST API (TLS 1.3, mutual TLS, OAuth2); IEC 60870-5-104 with IEC 62351-3 TLS or IPsec. · On request: IEC 60870-5-101, DNP3.

Plant: Modbus TCP/RTU, SunSpec, EtherCAT, hardwired emergency stop loop. · On request: IEC 61850.

Further protocols are added as Gateway adapters without changing the controller.

Technical documents

Datasheet and system description

ZorixGrid Datasheet

ITZ-ZG-DS-001-EN · Rev A · PDF, 0.5 MB

Download

System Description and Operating Philosophy

ITZ-ZG-SD-001-EN · available under NDA

Request
Grid operator profiles

One platform, any grid operator

Grid codes, dispatch rules, signal lists and security requirements differ from one system operator to the next. In ZorixGrid they live in a signed grid operator profile, not in the code. A new utility needs a new profile and, if its protocol differs, a Gateway adapter; the controller, software and operator screens stay the same. Site names, owner, battery supplier and O&M provider are settings, so the same product serves any developer and supplier.

Grid code values and response times from the profile.

Dispatch and market rules from the profile.

Operator protocol through a plug-in adapter.

Engineering principles

Built the way grid operators expect

Deterministic timing

Fast control runs on a fixed, guaranteed cycle, so worst-case response is known and testable.

One code base

The controller and its simulation models come from the same source, so they cannot drift apart.

Secure by design

Role-based access, encrypted links, tamper-evident logs. The cloud monitors; it never dispatches.

Vendor-neutral

Works with inverters, PCS and batteries from different manufacturers, on new and existing plants.

Utility-neutral

Everything utility-specific is configuration, versioned and signed, so every site runs the same tested software.

Planning a storage, solar or hybrid plant?

Tell us the plant size, the grid operator and the battery supplier, and we will come back with the configuration and a datasheet-level proposal.

Contact the energy team